日本精品高清一区二区_国产精品一区不卡在线_国产一区二区三区撒尿在线观看_亚洲不卡视频在线观看

 

Company News

Ningbo Xuyue New Material Technology Co., LTD. Wanyang Zhongchuang City phase II

發(fā)布時(shí)間:2024-03-26 13:27:23  點(diǎn)擊量:618

According to the relevant provisions of the construction project completion environmental acceptance procedure, Ningbo Xuyue New Materials Technology Co., LTD. Wanyang Zhongchuang City Phase II "Green Island" project (phase 1) completion environmental protection acceptance is publicized as follows:

Project Name: "Green Island" Project of the second phase of Wanyang Zhongchuang City (Phase 1)

Construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Construction Site: No. 1-2, Building 1, Wanyang Zhongchuang City, Beilun (Baifeng), Ningbo

Construction content: An annual output of 2000 tons of modified plastic particles

Major environmental measures:

(1) Wastewater treatment measures: The project will implement rain and pollution diversion, and the production wastewater will be discharged after treatment by sewage treatment facilities; Domestic sewage is discharged according to the standard after pretreatment by septic tank.

(2) Waste gas treatment measures: the hot melt extrusion waste gas of this project is collected by the gas collection hood, treated by a set of water spray + activated carbon device (TA003), and discharged through a 25m high exhaust cylinder (DA001) (and Ningbo Yizhu Shimming Health Technology Co., LTD., the extrusion and pouring exhaust gas exhaust gas share the same exhaust cylinder); The mixing machine shall be covered to prevent dust from escaping, and the mechanical ventilation measures of the workshop shall be strengthened. The entrance of the crusher is covered by a soft curtain, and the mechanical ventilation measures of the workshop are strengthened.

(3) Noise prevention measures: The main noise source of this project is the noise generated during the operation of various types of equipment. In order to ensure the standard discharge of factory boundary noise, the plant is rationally arranged and low noise equipment is selected to control the noise.

(4) Solid waste treatment measures: Scraps and unqualified products generated by this project are not solid waste after collection and crushing for reuse; The spray waste liquid and waste activated carbon were collected and entrusted to Ningbo Chitong Grease Co., LTD. Beilun branch for disposal; After collection and temporary storage for shelter, the household garbage shall be entrusted to the sanitation department for regular transportation.

Publicity period: March 8, 2024 - April 7, 2024 (20 working days)

The public can log on to http://www.d9902.com/ to check the investigation report and acceptance opinions of the project. If the public has comments and suggestions on the construction project, it can be reflected to the construction unit within the publicity period, and please leave contact information (name, address, telephone or email) to reflect the problem in order to get timely feedback.

Name of construction unit: Ningbo Xuyue New Materials Technology Co., LTD.

Contact: Mr. Xing

Tel: 13352370420


Attachment:

Xuyue new material acceptance report.pdf


Ningbo Xuyue New Materials Technology Co., LTD.

March 8, 2024

Responsive image
首頁  |  關(guān)于我們  |  產(chǎn)品中心  |  應(yīng)用領(lǐng)域  |  新聞中心  |  人力資源  |  聯(lián)系我們
  • Responsive image
  • Responsive image

    地址

    浙江省寧波前灣新區(qū)庵東鎮(zhèn)西三村場界路208號
  • Responsive image
  • Responsive image

    關(guān)注我們

  • 潜江市| 特克斯县| 博野县| 黔东| 石渠县| 任丘市| 兴业县| 博乐市| 万源市| 山丹县| 武山县| 墨竹工卡县| 米林县| 东乡族自治县| 光山县| 抚远县| 兴安县| 利辛县| 长乐市| 庆元县| 三河市| 安图县| 岳阳市| 德清县| 鸡西市| 高碑店市| 额济纳旗| 中阳县| 武义县| 永新县| 渑池县| 浪卡子县| 通河县| 洪湖市| 阳高县| 右玉县| 卫辉市| 文登市| 武城县| 晴隆县| 宁化县|